04 · Finish installation

General Finishes

A broad finishing sequence covering early rough-finish context, ceiling boards, painted surfaces, electrical preparation, flooring, doors and sanitary spaces.

Focus
Finish installation
Stages
07
Progress images
46
General Finishes representative construction view
04 / Featured view

View from the floor preparation, screeding and tiling progression.

Construction progression

The work,
stage by stage.

Every usable supplied image appears below in its original numbered progression.

01

Earlier structural/​rough-finish context

Early views establish the rough-finish condition before later installations.

Earlier structural and rough-finish context. View 01.
04.01

Earlier structural and rough-finish context. View 01.

Image 1 of 4: Earlier structural and rough-finish context. View 01.

02

Ceiling-board installation and ceiling finishing

Ceiling boards progress from installation to more complete finished surfaces.

Ceiling-board installation and finishing. View 01.
04.05

Ceiling-board installation and finishing. View 01.

Image 1 of 11: Ceiling-board installation and finishing. View 01.

03

Openings, wall finishing and painting

Openings and wall surfaces are recorded through finishing and painting activity.

Openings, wall finishing and painting. View 01.
04.16

Openings, wall finishing and painting. View 01.

Image 1 of 6: Openings, wall finishing and painting. View 01.

04

Electrical installation before final close-out

Visible electrical installation is recorded before final close-out.

Electrical installation before final close-out. View 01.
04.22

Electrical installation before final close-out. View 01.

Image 1 of 1: Electrical installation before final close-out. View 01.

05

Floor preparation, screeding and tiling

The floor sequence moves from preparation and screeding into tile installation.

Floor preparation, screeding and tiling. View 01.
04.23

Floor preparation, screeding and tiling. View 01.

Image 1 of 15: Floor preparation, screeding and tiling. View 01.

06

Doors and more complete rooms

Door installation appears as the rooms move toward a more complete condition.

Door installation and a more complete room. View 01.
04.38

Door installation and a more complete room. View 01.

Image 1 of 4: Door installation and a more complete room. View 01.

07

Bathroom tiling, fixtures and completed sanitary spaces

Bathroom views record wall tiling, fixture installation and completed sanitary spaces.

Bathroom tiling, fixtures and sanitary-space finishing. View 01.
04.42

Bathroom tiling, fixtures and sanitary-space finishing. View 01.

Image 1 of 5: Bathroom tiling, fixtures and sanitary-space finishing. View 01.