05 · Site infrastructure

External Works

External works documented from early utility activity and raw surfaces through drainage, apron preparation, concrete surfacing, metalwork, painting and hardscape.

Focus
Site infrastructure
Stages
08
Progress images
34
External Works representative construction view
05 / Featured view

View from the exterior finishing, painting and completed hardscape progression.

Construction progression

The work,
stage by stage.

Every usable supplied image appears below in its original numbered progression.

01

Underground/​utility and early external works

The external sequence opens with underground and early utility-related work.

Underground utility and early external work. View 01.
05.01

Underground utility and early external work. View 01.

Image 1 of 3: Underground utility and early external work. View 01.

02

Raw exterior surfaces and first render work

Raw external walls are shown as the first render work is applied.

Raw exterior surface and first render work. View 01.
05.04

Raw exterior surface and first render work. View 01.

Image 1 of 4: Raw exterior surface and first render work. View 01.

03

Boundary/​external wall plastering

Boundary and external walls progress through plaster application.

Boundary and external wall plastering. View 01.
05.08

Boundary and external wall plastering. View 01.

Image 1 of 5: Boundary and external wall plastering. View 01.

04

Drainage excavation and channel construction

Excavation and channel construction establish the visible drainage runs.

Drainage excavation and channel construction. View 01.
05.13

Drainage excavation and channel construction. View 01.

Image 1 of 5: Drainage excavation and channel construction. View 01.

05

Edging, apron and ground preparation

Edging and apron areas are prepared ahead of final surfacing.

Edging, apron and ground preparation. View 01.
05.18

Edging, apron and ground preparation. View 01.

Image 1 of 4: Edging, apron and ground preparation. View 01.

06

Concrete/​hardscape surfacing

Concrete surfacing progresses across the prepared hardscape areas.

Concrete hardscape surfacing in progress. View 01.
05.22

Concrete hardscape surfacing in progress. View 01.

Image 1 of 4: Concrete hardscape surfacing in progress. View 01.

07

Gate/​metalwork

The metal gate element is recorded before final placement.

Gate metalwork before final placement. View 01.
05.26

Gate metalwork before final placement. View 01.

Image 1 of 1: Gate metalwork before final placement. View 01.

08

Exterior finishing, painting and completed hardscape

Later views bring together exterior painting and the more complete hardscape.

Exterior finishing, painting and completed hardscape. View 01.
05.27

Exterior finishing, painting and completed hardscape. View 01.

Image 1 of 8: Exterior finishing, painting and completed hardscape. View 01.