Residential Development, Ikosi-Ketu
An ongoing residential development recorded from substructure foundations through ground-level work, suspended slab operations and upper-level walling.
- Focus
- Residential construction
- Stages
- 05
- Progress images
- 23
- Location
- Ikosi-Ketu
- Status
- Ongoing

View from the upper level walling and next slab formwork progression.
Construction progression
The work,
stage by stage.
Every usable supplied image appears below in its original numbered progression.
Substructure foundations
The residential sequence begins with successive substructure foundation operations.

Substructure foundation work in progress. View 01.
Image 1 of 9: Substructure foundation work in progress. View 01.
Ground level slab and vertical elements
Ground-level slab work and vertical elements follow the completed foundation sequence.

Ground-level slab and vertical elements. View 01.
Image 1 of 2: Ground-level slab and vertical elements. View 01.
Suspended slab formwork and site context
Formwork for the suspended slab is shown within the surrounding site context.

Suspended slab formwork and site context. View 01.
Image 1 of 5: Suspended slab formwork and site context. View 01.
Suspended slab reinforcement and concrete
Reinforcement preparation is followed by the developing concrete slab surface.

Suspended slab reinforcement and concrete work. View 01.
Image 1 of 4: Suspended slab reinforcement and concrete work. View 01.
Upper level walling and next slab formwork
Upper-level walling progresses toward the next slab-formwork stage.

Upper-level walling and next slab formwork. View 01.
Image 1 of 3: Upper-level walling and next slab formwork. View 01.