01 · Structural delivery

Super​structure

An ordered visual record of superstructure work, from low-level blockwork and room layout through vertical elements, openings, lintels and later shell preparation.

Focus
Structural delivery
Stages
07
Progress images
29
Superstructure representative construction view
01 / Featured view

View from the lintels/beams completed progression.

Construction progression

The work,
stage by stage.

Every usable supplied image appears below in its original numbered progression.

01

Low-level blockwork and layout

The sequence records early blockwork defining the building layout.

Low-level blockwork defining internal spaces. View 01.
01.01

Low-level blockwork defining internal spaces. View 01.

Image 1 of 4: Low-level blockwork defining internal spaces. View 01.

02

Walls rising and spaces taking shape

Blockwork rises as rooms and circulation spaces become more legible.

Blockwork progressing as spaces take shape. View 01.
01.05

Blockwork progressing as spaces take shape. View 01.

Image 1 of 6: Blockwork progressing as spaces take shape. View 01.

03

Reinforcement and vertical structural elements

Reinforcement and vertical elements are documented alongside the developing walls.

Reinforcement and vertical structural work in progress. View 01.
01.11

Reinforcement and vertical structural work in progress. View 01.

Image 1 of 6: Reinforcement and vertical structural work in progress. View 01.

04

Walls approaching full height

The walling progression approaches its full visible height.

Walling approaching full height. View 01.
01.17

Walling approaching full height. View 01.

Image 1 of 2: Walling approaching full height. View 01.

05

Lintel/​opening formwork

Temporary formwork defines lintels and the heads of visible openings.

Formwork positioned over wall openings. View 01.
01.19

Formwork positioned over wall openings. View 01.

Image 1 of 3: Formwork positioned over wall openings. View 01.

06

Lintels/​beams completed

Later views show completed lintel and beam work over the openings.

Completed lintel and beam work. View 01.
01.22

Completed lintel and beam work. View 01.

Image 1 of 4: Completed lintel and beam work. View 01.

07

Later shell and service-preparation views

The final shell views record internal spaces and visible service preparation.

Later shell and service-preparation view. View 01.
01.26

Later shell and service-preparation view. View 01.

Image 1 of 4: Later shell and service-preparation view. View 01.